PROJECT INFO

Construction of an interchange with two ramps and four loops:

  • Bridge at Wasit intersection, four dual lanes, 1.3 KM long
  • Link road, four dual lanes, 1.5 KM long
  • Round-about and two Link roads, four dual Lanes, 7 KM long
  • Solar Lightning Technology was used for the entire project

 

 Client

Saudi Aramco

 

 Duration

20 Month

  

 

 Location

Jubail

Leave a Reply

Review